top of page

AboitizPower's Clean Energy Plants Now At Full Capacity

  • Writer: By The Financial District
    By The Financial District
  • Aug 18, 2021
  • 1 min read

Aboitiz Power Corp has disclosed that units 3 and 4 of Hedcor’s Manolo Fortich 1 Hydro are now online and resynced to the Mindanao Grid after completion of restoration works.

Photo Insert: Cleanergy is AboitizPower’s brand for clean and renewable energy for customers and communities across the Mindanao region.

The aforementioned units with a combined gross capacity of 32 megawatts were temporarily de-energized to make way for pipe repairs. It can be recalled that persistent rains were experienced in Bukidnon last June 2020 which caused soil saturation, erosion, and mudslides, according to the company disclosure to the Philippine Stock Exchange.


This resulted in pipe dislocations, pipe bursts, and damage to the high head penstock line. Restoration works for affected facilities of Manolo Fortich 1 hydro were completed in 358 days.


Together with the four units of Manolo Fortich 1 Hydro (45.94MW) and another four units of Manolo Fortich 2 Hydro (27.38MW), Hedcor Bukidnon is now generating at the full gross capacity of 73.32MW.


These plants generate Cleanergy, AboitizPower’s brand for clean and renewable energy for customers and communities across the Mindanao region.



Optimize asset flow management and real-time inventory visibility with RFID tracking devices and custom cloud solutions.
Sweetmat disinfection mat

TFD (Facebook Profile) (1).png
TFD (Facebook Profile) (3).png

Register for News Alerts

  • LinkedIn
  • Instagram
  • X
  • YouTube

Thank you for Subscribing

The Financial District®  2023

bottom of page